Results-driven Onshore & offshore, SURF projects professional with 6+ years of experience delivering complex EPCIC projects across the oil and gas sector for leading operators, including North Oil Company (NOC) and Shell. Demonstrated success in managing multidisciplinary project execution across engineering, procurement, fabrication, construction, marine operations, offshore installation, hook-up, pre-commissioning, and commissioning. Proven ability to lead cross-functional teams, engage stakeholders, mitigate project risks, and drive safe, efficient, and on-time delivery throughout the project lifecycle. Experienced in Advanced Work Packaging (AWP), project planning, digital reporting, offshore execution, and operational readiness, with a strong commitment to HSE, quality, and continuous improvement in fast-paced, high-value project environments.
Summary
Education
- ESC Rennes School of Business Master of Science, Logistics Grade : Thesis: "Reducing On-Time Delivery in Logistics Using IoT," on IoT solutions to improve delivery efficiency and reduce delays. Sep 2018 - Dec 2019
- K.S.R. College of Engineering Bachelor of Engineering, Mechanical Grade : Presented papers and delivered projects including a "Solar Electric Pump" for agricultural use. Aug 2014 - Apr 2018
Experience
- Interface Engineer Interface Engineer | Milaha (Halul Offshore Marine Services) Oct 2024 - Jun 2026 • 1 yr 9 mos
North Fibre Link Project (EPCIC 15, 16 & 17)
Client: North Oil Company Role: Interface Engineer Location: Al-Shaheen Field, Qatar
Led interface coordination for the 140 km Fibre Optic Cable (FOC) installation from onshore Qatar to offshore platforms.
Coordinated multidisciplinary teams across engineering, procurement, construction, marine, and commissioning.
Planned offshore vessel mobilization and demobilization, ensuring on-time execution during critical installation windows.
Managed SIMOPS activities by maintaining interface registers, layout plans, and risk assessments to prevent operational clashes.
Monitored fabrication of subsea crossing structures and resolved design changes, NCRs, and NDT quality issues.
Directed pre-commissioning and commissioning activities, including system dossiers and client documentation.
Managed punch lists, Technical Queries (TQs), NCRs, and change requests throughout SURF execution.
Coordinated OTDR and LSPM testing for fibre optic cable commissioning and client acceptance.
Resolved electrical, telecom, and structural interface issues between subcontractors to protect the project schedule.
Managed DSV (Dive Support Vessel) operations for subsea intervention and offshore construction interfaces.
Led J-tube cable pull-in operations, coordinating platform teams, vessel crews, and onshore engineers.
Reviewed winch design, load calculations, and deployment procedures to ensure safe cable installation in compliance with client standards.
- Project Engineer Project Engineer | Interface | Seatrium Offshore Platforms Sep 2022 - Oct 2024 • 2 yrs 2 mos
Client: Shell Crux (NNM – Not Normally Manned Platform)
Reviewed EPCI contractor engineering designs, specifications, and deliverables to ensure alignment with project and client requirements.
Liaised with KBR Engineering to manage multiple-query boundaries and develop interface diagrams for offshore execution.
Supported the 400-ton Crux topside heavy-lift operation, coordinating multidisciplinary stakeholders during fabrication and installation readiness.
Participated in daily No-Go readiness meetings, risk assessments, and lift planning reviews to verify AFC drawings, permits, engineering deliverables, and construction prerequisites.
Coordinated closure of punch-list items and critical interface actions required for heavy-lift readiness.
Acted as Single Point of Contact (SPOC) through the WIR interface register for multiple contractors and subcontractors.
Coordinated interfaces across pipelines/subsea, substructure jackets, wells, fibre optics, and ICT disciplines.
Applied Advanced Work Packaging (AWP) methodologies, including EWP, PWP, and CWP, to improve work sequencing and execution readiness.
Coordinated construction and planning activities while tracking weekly KPIs against the approved project schedule.
Served as the primary contact for external interface matters, resolving issues between project teams, contractors, and stakeholders.
Developed and managed Power BI dashboards to monitor progress, identify site clashes, and track hazard observations using AI-driven insights.
Worked with package engineers to resolve vendor data issues and ensure timely delivery of technical documentation.
Coordinated with warehouse teams on material receiving, inspection clearance, and material status.
Coordinated with fabrication teams for the handover of fabricated project materials and ship-loose materials.
Work Preferences
Skills
Languages
- EnglishNative speaker
- FrenchHighly proficient
Thesis Masters
Role: Individual Researcher / MSc Thesis Project
Date: 2018–2019
Action: Independently investigated the causes of delays and inefficiencies affecting on-time delivery in logistics operations.
Method: Researched and evaluated the application of IoT-based solutions for real-time shipment tracking, monitoring, and improved visibility across the delivery process.
Result: Developed an IoT-focused approach to improve delivery visibility, identify potential delays earlier, and support more efficient logistics decision-making.
Certifications
- OPITO TBOSIET & H2S Certified OPITOIssued Mar 2021 • Expired Mar 2025
- PMI Risk Management LinkedIn LearningIssued Sep 2020 • Expired Sep 2025