cover
OHN MAH KYAW | Gengen

OHN MAH KYAW


SITE ENGINEER | Prime - Boss Co., Ltd (SHARP)
Singapore

Summary

Results-driven Electrical Engineering professional with over 15 years of experience in the marine, offshore, and industrial environment. Proven track record in managing, installation, commissioning, and maintenance projects for main switchboards, consoles, MV and LV panels. Strong understanding of QESH regulations and ISO standards. Adept at leading teams, optimizing processes, and ensuring on-time project delivery with high quality standards. My career spans both Myanmar and Singapore.

Education

  1. logo
    LINCOLN University College (ETVA) Diploma, Managerial Psychology Grade : High Distinction Jun 2025 - Nov 2025
  2. logo
    Dagon University Bachelor of Science, Physics Jan 1995 - Jan 2002

Experience

  1. logo
    ASSISTANT MANAGER Asia General Electric Company Limited Dec 2019 - Apr 2026 • 6 yrs 5 mos

    Planned production schedule to meet deadlines Oversaw all production activities related to production processes and machine operation Identified and resolved technical and production issues Developed KPIs for production efficiency, machine utilization and downtime reduction Controlled and improved waste management processes Led production team, managing projects and SAP processes within the area of responsibility Observed products quality, productivity, costs, project/program expenses, resource utilization, and timely completion Motivated the team to drive a 10% increase in productivity reaching target ahead of schedule Coordinated with a cross-functional team to prevent production delays Estimated departmental budgets and forecasted inventory spending requirements Coached team members for professional and technical development Kept workplace safety and health standards

  2. logo
    SITE ENGINEER Prime - Boss Co., Ltd (SHARP) Jan 2003 - Apr 2007 • 4 yrs 4 mos
    Myanmar
    | Onsite

    Developed comprehensive work schedules and monitored progress to ensure all project milestones were met ahead of schedule. Analyzed engineering drawings to prepare accurate Bills of Quantities (BQ) and material take-offs. Optimized resource allocation by arranging manpower and essential tooling to ensure seamless site installation processes. Led value engineering initiatives to identify cost-saving opportunities, successfully achieving a 10% reduction in overall project expenditure. Supervised site activities to ensure strict adherence to As-Built Drawings and approved Method Statements (MS). Conducted joint site inspections with main contractors and consultants to verify installations against Material Approvals (MA). Facilitated daily coordination meetings to resolve bottlenecks and align multidisciplinary teams. Managed the technical query process by submitting and tracking RFIs (Request for Information) and VOs (Variation Orders). Compiled comprehensive project close-out packages, including As-Built drawings, test reports, warranty documentation, and handover certificates. Collaborated with project stakeholders to clarify technical details, ensuring all installations met client specifications. Resolved post-installation technical issues, providing expert after-sales support to maintain high levels of customer satisfaction.

Skills

  1. Ladder Logic
    Expert
  2. Electrical
    Expert

Certifications

  1. logo
    COMOS Training Cabinet Layout SIEMENS, Singapore
    Issued Aug 2013 • Expired Aug 2013
  2. logo
    Communication & Collaboration Skill MegaTrends
    Issued Jun 2023 • Expired Jun 2023

Languages

  1. English
    Native speaker
  2. Myanmar
    Native speaker